LITA Field Testing 2015, Day 6 (April 2)

Yesterday afternoon, the shipping crate carrying the Zoe rover and Honeybee’s LITA drill arrived at Paranal Observatory. We worked into the night and this morning assembling the rover and performing functional tests on its instruments. Today, we transported Zoe to the first testing site and worked on system calibrations. I calibrated the drill’s sample cache carousel to prepare the rover for field testing tomorrow.

IMG_1611 IMG_1628 IMG_1640

Posted in Atacama Desert | Tagged , , , , , | Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

prealliance-uneminent